What we deliver for construction projects
- Structured cabling for site offices and permanent buildings, on a single termination standard
- Site fibre provisioning with routes designed to carry over to the permanent comms cabinet
- Temporary electrical: site office power, temporary distribution boards, contractor plug-in points, site lighting
- Permanent electrical: switchboard build, sub-board distribution, lighting and power circuits, certified at handover
- Site CCTV: perimeter, compound, plant and material storage, with cameras carried over to permanent install where suitable
- Access control commissioning at fit-out handover
- Coordination with the rest of the trades on site
Why it matters
Construction sites carry a unique cost pattern in technology: most of the temporary infrastructure gets installed twice — once for the build, once for the permanent fit-out — because the temporary install isn't designed to fold into the permanent system. Same cabling goes in, comes out, goes back in. Same site CCTV gets ripped out and replaced. Same fibre carrier order goes in twice. Alexis IT designs the temporary infrastructure with the permanent fit-out in mind, so the cabling, fibre and CCTV carry across without being re-installed and the customer doesn't pay to do it twice.
How we work with construction firms
We scope construction work against the build programme — site office requirements upfront, fit-out specification at the milestone where it lands, handover scheduled inside the firm's commissioning window. Temporary site infrastructure is designed for the permanent building it will become part of, so cabling routes, fibre terminations and camera positions are planned with both phases in mind. At handover for each phase, you receive the as-built pack — same documentation standard as a single-phase project.
Outcomes
- Temporary infrastructure that folds into the permanent build, not re-installed at fit-out
- One accountable team across cabling, fibre, electrical and security
- Carrier connectivity that doesn't need to be re-ordered at fit-out
- As-built documentation across both phases on one standard
Who this fits
Commercial construction firms across Waikato and Bay of Plenty managing long-running builds with their own site offices, multi-stage commercial fit-outs, and any project where the temporary site infrastructure has a useful life beyond the build itself.
CTA
Book a Project Consultation — we will look at the build programme, scope temporary and permanent infrastructure as one plan, and propose a single coordinated programme.